{"id":2593,"date":"2019-09-20T11:29:54","date_gmt":"2019-09-20T09:29:54","guid":{"rendered":"https:\/\/www.npkrka.hr\/?p=2593"},"modified":"2025-12-02T13:01:27","modified_gmt":"2025-12-02T12:01:27","slug":"evaluacija-stanja-u-sustavu-upravljanja-np-krka-analiza-prihvatnog-kapaciteta-i-studija-upravljanja-posjetiteljima-np-krka","status":"publish","type":"post","link":"https:\/\/npkrka.hr\/en_us\/2019\/09\/20\/evaluacija-stanja-u-sustavu-upravljanja-np-krka-analiza-prihvatnog-kapaciteta-i-studija-upravljanja-posjetiteljima-np-krka\/","title":{"rendered":"The SUP \u2013 APUP Project"},"content":{"rendered":"<p>[hr]<\/p>\n<p>Javna ustanova \u201eNacionalni park Krka\u201c (u daljnjem tekstu: JU \u201eNP Krka\u201c), koja upravlja za\u0161ti\u0107enim podru\u010djem Nacionalni park \u201eKrka\u201c (u daljnjem tekstu: NP \u201eKrka\u201c), naru\u010dila je uslugu izrade evaluacije stanja u sustavu upravljanja NP \u201eKrka\u201c, analize prihvatnog kapaciteta i izrade studije upravljanja posjetiteljima (u daljnjem tekstu: Projekt SUP \u2013 APUP).<\/p>\n<p>Postupak ugovaranja usluge proveden je u sklopu ugovora o dodjeli bespovratnih sredstava za projekt \u201eNepoznata Krka \u2013 skrivena blaga gornjeg i srednjeg toka rijeke Krke\u201c (KK 06.1.2.01.0003) u okviru Poziva na dostavu projektnih prijedloga Promicanje odr\u017eivog kori\u0161tenja prirodne ba\u0161tine u nacionalnim parkovima i parkovima prirode, Operativnog programa \u201eKonkurentnost i kohezija 2014. \u2013 2020.\u201c Projekt je sufinancirala Europska unija iz Europskog fonda za regionalni razvoj.<\/p>\n<p>\u00a0<\/p>\n<p><strong>Op\u0107i cilj Projekta SUP \u2013 APUP<\/strong><\/p>\n<p>Projekt SUP \u2013 APUP provodi se u sklopu projekta \u201eNepoznata Krka\u201c i sastoji se od dva me\u0111usobno povezana dokumenta:<\/p>\n<ol>\n<li>\u201eEvaluacije stanja u sustavu upravljanja NP &#8216;Krka&#8217;, analiza prihvatnog kapaciteta\u201c\u00a0i<\/li>\n<li>\u201eStudije upravljanja posjetiteljima NP &#8216;Krka&#8217;\u201c.<\/li>\n<\/ol>\n<p>\u00a0<\/p>\n<p>Op\u0107i cilj projekta je, temeljem evaluacije postoje\u0107eg stanja i dosada\u0161njeg sustava upravljanja posjetiteljima NP \u201eKrka\u201c, razviti upravlja\u010dki okvir i odrediti primjerene ciljeve, aktivnosti i pokazatelje u\u010dinkovitosti kojima \u0107e se uskla\u0111eno sa za\u0161titom prirodnih i drugih vrijednosti unaprijediti upravljanje posje\u0107ivanjem i posjetiteljska infrastruktura NP \u201eKrka\u201c.\u00a0\u201eStudija upravljanja posjetiteljima\u201c \u0107e sadr\u017eavati \u201eAkcijski plan upravljanja posjetiteljima (u daljnjem tekstu: APUP) NP &#8216;Krka&#8217;\u201c za razdoblje od 2019. do 2031.<\/p>\n<p>APUP \u0107e za navedeno plansko razdoblje odrediti ciljeve upravljanja posje\u0107ivanjem\/posjetiteljima i razraditi aktivnosti za postizanje tih ciljeva i pokazatelje provedbe plana i u\u010dinkovitosti upravljanja, vode\u0107i se sljede\u0107im smjernicama:<\/p>\n<ul>\n<li>integralno sagledati i \u0161ire podru\u010dje (zonu utjecaja i funkcionalnu regiju) povezano s vizijom, posje\u0107ivanjem i odgovaraju\u0107om posjetiteljskom infrastrukturom NP \u201eKrka\u201c,<\/li>\n<li>po reviziji ciljeva upravljanja, odrediti primjerene pokazatelje i standarde te strategije i tehnike upravljanja brojem, strukturom i prostorno-vremenskom disperzijom posjetitelja,<\/li>\n<li>razviti model upravljanja posje\u0107ivanjem primjeren NP \u201eKrka\u201c,<\/li>\n<li>definirati zone prema intenzitetu posje\u0107ivanja sukladno ciljevima upravljanja i za\u0161tite,<\/li>\n<li>predlo\u017eiti programe i aktivnosti otvorene participaciji lokalnih dionika te poticajne lokalnom razvoju,<\/li>\n<li>primjenom kumulativnih iskustava Izvr\u0161itelja i metodologijom sukladnih aktualnim svjetskim praksama i teorijskim okvirima, razviti model upravljanja posje\u0107ivanjem primjeren NP \u201eKrka\u201c.<\/li>\n<\/ul>\n<p>APUP se izra\u0111uje u skladu s na\u010delima prilagodljivog i participativnog upravljanja\/planiranja. Participativnost podrazumijeva uklju\u010divanje dionika na razli\u010dite na\u010dine i na razli\u010ditim razinama u razli\u010dite faze ciklusa upravljanja NP \u201eKrka\u201c.<\/p>\n<p>\u00a0<\/p>\n<p><strong>FINALNO PREDSTAVLJANJE EVALUACIJE STANJA U SUSTAVU UPRAVLJANJA NP \u201eKRKA\u201c, ANALIZA PRIHVATNOG KAPACITETA (3. sije\u010dnja 2019.)<\/strong><\/p>\n<p>Finalno predstavljanje \u201eEvaluacije stanja u sustavu upravljanja NP &#8216;Krka&#8217;, analiza prihvatnog kapaciteta\u201c odr\u017eano je 3. sije\u010dnja 2019. godine. Na predstavljanju su prisustvovali\u00a0\u010dlanovi projektnog tima JU \u201eNP Krka\u201c i \u010dlan stru\u010dnog tima, predstavnik Izvr\u0161itelja Marko Jakeli\u0107 koji je izvr\u0161io detaljnu prezentaciju Evaluacije. Zaklju\u010deno je kako je Evaluacija izra\u0111ena u skladu s dokumentacijom o nabavi i ugovorom, uz uva\u017eavanje svih specifi\u010dnosti NP \u201eKrka\u201c i potreba JU \u201eNP Krka\u201c ustanovljenih kroz provedene koordinacije i radionice.<\/p>\n<p>U prezentaciji Evaluacije, stavljeni su naglasci na sadr\u017eaj, metodologiju izrade, klju\u010dne pojmove, odnose va\u017ee\u0107ih dokumenata i dokumenata i projekata \u010dija je izrada, odnosno provedba u tijeku, analizu smjernica vezanih uz posje\u0107ivanje po upravlja\u010dkim zonama, evaluaciju stanja po stavcima sukladno smjernicama HAOP-a iz 2018., na SWOT analizu te priloge u elaboratu. U Evaluaciji su navedene sve relevantne informacije zaklju\u010dno sa samim krajem prosinca 2018. godine.<\/p>\n<p>\u00a0<\/p>\n<p><strong>STUDIJA UPRAVLJANJA POSJETITELJIMA \u2013 AKCIJSKI PLAN UPRAVLJANJA POSJETITELJIMA<\/strong><\/p>\n<p>ODR\u017dANE RADIONICE S DIONICIMA (8. i 9. travnja 2019.)<\/p>\n<p>APUP se izra\u0111uje u skladu s na\u010delima prilagodljivog i participativnog upravljanja\/planiranja. Participativnost podrazumijeva uklju\u010divanje dionika na razli\u010dite na\u010dine i na razli\u010ditim razinama u razli\u010dite faze ciklusa upravljanja NP \u201eKrka\u201c.<\/p>\n<p>Ukupno \u0161est radionica s lokalnim dionicima odr\u017eano je 8. i 9. travnja 2019. s ciljem njihovog informiranja o aktivnostima JU \u201eNP Krka\u201c koje su u tijeku. Prijedlozi i mi\u0161ljenja dionika uklju\u010dena su u izradu nacrta ciljeva i aktivnosti u upravljanju posjetiteljima NP \u201eKrka\u201c do 2031. godine.<\/p>\n<p>Na radionicama su sudjelovali razli\u010diti dionici podijeljeni po fokus grupama: uprava\/javnopravna tijela, \u201eznanost i kultura\u201c (veleu\u010dili\u0161ta u Kninu i \u0160ibeniku, zadarsko Sveu\u010dili\u0161te&#8230;), lokalne zajednice, \u201egospodarski subjekti\u201c (usluge u turizmu, hoteli, turisti\u010dke agencije&#8230;), odgojno-obrazovne ustanove i lokalne zajednice (gradovi i op\u0107ine).<\/p>\n<p>Dionici su pozivima i prilo\u017eenim materijalima temeljito informirani o izradi \u201eAkcijskog plana upravljanja posje\u0107ivanjem\u201c, odnosno aktivnostima koje provodi JU \u201eNP Krka\u201c, a na radionicama su i detaljno informirani o op\u0107im i posebnim ciljevima i kontekstom izrade studije\/APUP-a, te su upoznati s klju\u010dnim izvodima iz evaluacije stanja u sustavu posje\u0107ivanja. Sudionici radionice sudjelovali su u razmatranju preliminarnog prijedloga op\u0107eg i posebnih ciljeva upravljanja posje\u0107ivanjem NP \u201eKrka\u201c za razdoblje 2019. \u2013 2031., zatim u razmatranju prijedloga aktivnosti za postizanje predlo\u017eenih ciljeva te su dali svoje na\u010delne i specifi\u010dne komentare, mi\u0161ljenja i prijedloge za daljnji rad na izradi nacrta ciljeva i aktivnosti u upravljanju posjetiteljima NP \u201eKrka\u201c za navedeno plansko razdoblje.<\/p>\n<p>\u00a0<\/p>\n<p><strong>ZAVR\u0160NO PREDSTAVLJANJE STUDIJE UPRAVLJANJA POSJETITELJIMA (3. srpnja 2019.)<\/strong><\/p>\n<p>Javna ustanova \u201eNacionalni park Krka\u201c (u daljnjem tekstu: JU \u201eNP Krka\u201c), koja upravlja za\u0161ti\u0107enim podru\u010djem Nacionalni park \u201eKrka\u201c (u daljnjem tekstu: NP \u201eKrka\u201c), naru\u010dila je uslugu izrade evaluacije stanja u sustavu upravljanja NP \u201eKrka\u201c, analize prihvatnog kapaciteta i izrade studije upravljanja posjetiteljima (u daljnjem tekstu: Projekt SUP \u2013 APUP).<\/p>\n<p>Postupak ugovaranja usluge proveden je u sklopu ugovora o dodjeli bespovratnih sredstava za projekt \u201eNepoznata Krka \u2013 skrivena blaga gornjeg i srednjeg toka rijeke Krke\u201c (KK 06.1.2.01.0003) u okviru Poziva na dostavu projektnih prijedloga Promicanje odr\u017eivog kori\u0161tenja prirodne ba\u0161tine u nacionalnim parkovima i parkovima prirode, Operativnog programa \u201eKonkurentnost i kohezija 2014. \u2013 2020.\u201c Projekt je sufinancirala Europska unija iz Europskog fonda za regionalni razvoj.<\/p>\n<p>\u00a0<\/p>\n<p><u>Op\u0107i cilj Projekta SUP \u2013 APUP:<\/u><\/p>\n<p>Temeljem evaluacije postoje\u0107eg stanja i dosada\u0161njeg sustava upravljanja posjetiteljima NP \u201eKrka\u201c, razviti Upravlja\u010dki okvir i odrediti primjerene ciljeve, aktivnosti i pokazatelje u\u010dinkovitosti, kojima \u0107e se uskla\u0111eno sa za\u0161titom prirodnih i drugih vrijednosti unaprijediti upravljanje posje\u0107ivanjem i posjetiteljska infrastruktura NP \u201eKrka\u201c.<\/p>\n<p>\u00a0<\/p>\n<p><u>Specifi\u010dni ciljevi Projekta SUP \u2013 APUP:<\/u><\/p>\n<ul>\n<li>evaluacijom stanja \u2013 na tragu smjernica HAOP-a iz o\u017eujka 2018. (http:\/\/www.haop.hr\/hr\/tematska-podrucja\/zasticena-podrucja\/upravljanjezasticenim-podrucjima\/smjernice), a uz prilagodbu svim specifi\u010dnostima NP \u201eKrka\u201c \u2013 posebno obuhvatiti vrednovanje i sintezu dosada\u0161njih istra\u017eiva\u010dkih iskoraka i upravlja\u010dkih iskustava JU \u201eNP Krka\u201c te, po potrebi, provesti i dopunska istra\u017eivanja;<\/li>\n<\/ul>\n<ul>\n<li>uz podru\u010dje NP \u201eKrka\u201c, integralno sagledati i \u0161ire podru\u010dje (zonu utjecaja i funkcionalnu regiju) povezano s vizijom, posje\u0107ivanjem i odgovaraju\u0107om posjetiteljskom infrastrukturom NP \u201eKrka\u201c;<\/li>\n<\/ul>\n<ul>\n<li>po reviziji\/utvr\u0111ivanju ciljeva upravljanja, odrediti primjerene pokazatelje i standarde te strategije i tehnike upravljanja brojem, strukturom i prostornovremenskom distribucijom posjetitelja;<\/li>\n<\/ul>\n<ul>\n<li>primjenom kumulativnih iskustava Izvr\u0161itelja i metodologija sukladnih aktualnim svjetskim praksama i teorijskim okvirima (posebno recentni IVUMC-VUM, kao sinteza ROS \/ LAC \/ VERP iskustava), vrednovanja usluga ekosustava te relevantnih preporuka (IUCN, KEC, EUROPARC, HAOP\u2026), razviti model upravljanja posje\u0107ivanjem primjeren NP \u201eKrka\u201c;<\/li>\n<\/ul>\n<ul>\n<li>definirati zone prema intenzitetu posje\u0107ivanja (od zona bez posje\u0107ivanja do zone intenzivnog posje\u0107ivanja) sukladno ciljevima upravljanja i za\u0161tite te dati prijedloge mikro-zoniranja (mj. 1:5000, mj. 1:2000\/1:1 000);<\/li>\n<\/ul>\n<ul>\n<li>predlo\u017eiti programe i aktivnosti otvorene participaciji lokalnih dionika te poticajne lokalnom razvoju;<\/li>\n<\/ul>\n<ul>\n<li>zaklju\u010dke Projekta prikazati tekstualnim, grafi\u010dkim, grafi\u010dko-tekstualnim i tabli\u010dnim prikazima koji svu slo\u017eenost procesa i uvjeta povezanih s posje\u0107ivanjem NP \u201eKrka\u201c \u2013 kako unutar NP-a tako i u neposrednoj i \u0161iroj okolici \u2013 komuniciraju na jezgrovit i operativno (provedbeno) orijentiran na\u010din (uklju\u010duju\u0107i i smjernice za povezivanje sektorskih planova\/dokumenata);<\/li>\n<\/ul>\n<ul>\n<li>izdati uputu Upravi Parka o na\u010dinu pra\u0107enja broja posjetitelja u odnosu na zadane stupnjeve za\u0161tite uva\u017eavaju\u0107i prostorno-plansku i drugu regulaciju, iskustva provedbe plana upravljanja 2011. \u2013 2017. te principe participativnog i prilagodljivog upravljanja u dinami\u010dkoj okolini.<\/li>\n<\/ul>\n<p>\u00a0<\/p>\n<p>Nakon izrade elaborata \u201eEvaluacija stanja u sustavu upravljanja NP &#8216;Krka&#8217;\u201c, analiza prihvatnog kapaciteta(u daljnjem tekstu: Evaluacija), projektni zadatak za uslugu izrade Studije upravljanja posjetiteljima izvr\u0161en je, sukladno DON, u 2 faze:<\/p>\n<ol>\n<li><u> Faza: Op\u0107i ciljevi i okvir upravljanja posjetiteljima NP \u201eKrka\u201c<\/u><\/li>\n<\/ol>\n<p>\u00a0<\/p>\n<ul>\n<li>dobivanjem rezultata iz 1. studije potrebno je predlo\u017eiti smjernice za izradu studije upravljanja posjetiteljima;<\/li>\n<li>informirana primjena koncepata nosivog kapaciteta i vrednovanja usluga ekosustava na na\u010din da se referiranjem na relevantne okvire upravljanja posjetiteljima (posebno na recentni IVUMC-VUM7) i preporuke (IUCN, KEC, EUROPARC, HAOP), razvija okvir upravljanja posjetiteljima primjeren NP \u201eKrka\u201c;<\/li>\n<li>SWOT analiza;<\/li>\n<li>organizirati radionice\/konzultacije s lokalnim dionicima:<\/li>\n<\/ul>\n<ol>\n<li>lokalna i regionalna uprava<\/li>\n<li>uredi \u017eupanijskih turisti\u010dkih zajednica \u0160ibensko-kninske, Splitsko-dalmatinske i Zadarske \u017eupanije<\/li>\n<li>iznajmljiva\u010di, ugostitelji, OPG-ovi, hotelijeri<\/li>\n<li>putni\u010dke agencije, touroperatori<\/li>\n<li>odgojno-obrazovne institucije<\/li>\n<li>lokalno stanovni\u0161tvo;<\/li>\n<\/ol>\n<ul>\n<li>Revizija ciljeva \/ novi ciljevi upravljanja posjetiteljima:<\/li>\n<\/ul>\n<ol>\n<li>ciljana prostorno-vremenska organizacija posje\u0107ivanja, struktura posjetitelja<\/li>\n<li>pregled strategija i tehnika za upravljanje posjetiteljima te odgovaraju\u0107ih kvantitativnih i kvalitativnih pokazatelja i standarda<\/li>\n<li>prijedlog mjera obra\u0107anja ciljanim skupinama posjetitelja;<\/li>\n<\/ol>\n<ul>\n<li>smjernice za izradu novog plana upravljanja i druge nastavne planske dokumente, projekte, istra\u017eivanja i monitoring;<\/li>\n<li>preispitivanje mogu\u0107nosti i unaprje\u0111enja sustava upravljanja posjetiteljima u planskim razdobljima sukladno potrebama JU \u201eNP Krka\u201c;<\/li>\n<li>predlaganje odgovaraju\u0107eg okvira upravljanja posjetiteljima \u201eNP Krka\u201c.<\/li>\n<\/ul>\n<p>\u00a0<\/p>\n<ol start=\"2\">\n<li><u> Faza: Akcijski plan upravljanja posjetiteljima NP \u201eKrka\u201c 2019. \u2013 2031.<\/u><\/li>\n<\/ol>\n<ul>\n<li>Utvr\u0111ivanje specifi\u010dnih upravlja\u010dkih ciljeva i aktivnosti koje su potrebne za postizanje<br \/>zacrtanih ciljeva:<\/li>\n<\/ul>\n<ol>\n<li>kartografski prikaz, numeracija i naziv pojedinih zona<\/li>\n<li>prijedlog po obliku posje\u0107ivanja i njihovo povezivanje s pojedinom zonom posje\u0107ivanja<\/li>\n<li>evidencija potrebne infrastrukture s procjenom tro\u0161kova<\/li>\n<li>upravlja\u010dke mjere vezane uz kretanje i prostorno povezivanje s procjenom tro\u0161kova<\/li>\n<li>prijedlog koncepta brendiranja i marketin\u0161kih aktivnosti s procjenom tro\u0161kova;<\/li>\n<\/ol>\n<ul>\n<li>odre\u0111ivanje pokazatelja za pra\u0107enje provedbe i procjenu u\u010dinkovitosti upravljanja posjetiteljima NP \u201eKrka\u201c;<\/li>\n<li>procjena potrebnih resursa s prikazom mogu\u0107ih tro\u0161kova;<\/li>\n<li>definiranje pokazatelja u\u010dinkovitosti upravljanja potrebnih u narednom<br \/>razdoblju za provedbu akcijskog plana;<\/li>\n<li>predstavljanje zaklju\u010daka dionicima;<\/li>\n<li>utvr\u0111ivanje smjernica za provo\u0111enje istra\u017eivanja u budu\u0107nosti (koja istra\u017eivanja provoditi, u kojem razdoblju, \u0161to se s njima \u017eeli posti\u0107i, koje dionike okupljati i za\u0161to);<\/li>\n<li>utvr\u0111ivanje sustava za evaluaciju i pra\u0107enje provo\u0111enja mjera akcijskog plana s jasno zadanim aktivnostima, vremenskim okvirom, odgovornostima i resursima potrebnim za provedbu;<\/li>\n<li>utvr\u0111ivanje sustava za pra\u0107enje ostvarenja indikatora akcijskog plana s navedenim izvorom i dinamikom provjere.<\/li>\n<\/ul>\n<p>Predstavljanje finalnog dokumenta &#8220;Studije upravljanja posjetiteljima NP &#8216;Krka&#8217;\u201c odr\u017eano je 3. srpnja 2019. Na predstavljanju su prisustvovali \u010dlanovi projektnog tima JU \u201eNP Krka\u201c, predstavnik Izvr\u0161itelja Marko Jakeli\u0107 i svi rukovoditelji uklju\u010deni u izradu Studije.<\/p>\n<p>[\/hr]<\/p>\n<p>[en]<br \/>\n<strong>The SUP \u2013 APUP Project<\/strong><br \/>\nThe Public Institution Krka National Park (further: PI Krka National Park), which manages the protected area of the Krka National Park (further: Krka National Park), has commissioned an evaluation of the situation in the management system of the Krka National Park, an analysis of the reception capacity, and a study of the visitor management (further: the SUP \u2013 APUP Project).<\/p>\n<p>The process of contracting the service was carried out as part of the grant contract for the project &#8220;The Unknown Krka \u2013 Hidden Treasures of the Upper and Middle Courses of the Krka River&#8221; (CC 06.1.2.01.0003) in the framework of the Call for Proposals for the Promotion of Sustainable Utilization of the Natural Heritage in National and Nature Parks, as a part of the Operational Program &#8220;Competitiveness and Cohesion 2014-2020&#8221;. The project is co-financed by the European Union from the European Regional Development Fund.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>The overall objectives of the SUP \u2013 APUP Project<\/strong><\/p>\n<p>The SUP \u2013 APUP project is being implemented within the project &#8220;The Unknown Krka&#8221; and consists of two interrelated documents:<\/p>\n<ol>\n<li>\u00a0\u201cAn evaluation of the situation in the management system of the Krka National Park, an analysis of the reception capability\u201d and<\/li>\n<li>\u201cA study of visitor management at Krka National Park\u201d.<\/li>\n<\/ol>\n<p>&nbsp;<\/p>\n<p>The overall objective of the project, based on the evaluation of the current state and the current visitor management system of the Krka National Park, is to develop a management framework and set appropriate goals, activities, and performance indicators that will, in accordance with the protection of natural and other features, improve visitor management and the visitor infrastructure of the Krka National Park. The &#8220;Visitor Management Study&#8221; will contain the &#8220;Visitor Management Action Plan (further: APUP) of the Krka National Park for the period from 2019 to 2031.<\/p>\n<p>The APUP will determine visitor management goals for the given planning period and specify activities to achieve those goals, along with indicators for plan implementation and management effectiveness, according to the following guidelines:<\/p>\n<ul>\n<li>The development of an integral overview of the wider area (region of influence and function) as associated with the vision, visitation levels, and suitable visitor infrastructure of the Krka National Park;<\/li>\n<li>After revision of management objectives, the determination of appropriate indicators, standards, and strategies and techniques for managing the number, structure and spatial-temporal dispersion of visitors;<\/li>\n<li>The development of a management model suitable to the Krka National Park;<\/li>\n<li>The definition of zones according to the intensity of visiting in line with the aims of management and protection;<\/li>\n<li>The suggestion of programs and activities involving open participation of local elements and the promotion of local development;<\/li>\n<li>The application of the cumulative experience of the management staff and a methodology consistent with current world practices and theoretical frameworks, to develop a visitor management model suitable to the Krka National Park.<\/li>\n<\/ul>\n<p>The APUP has been worked out in accordance with the principles of adaptive and participatory management\/planning. Participation refers to the involvement of stakeholders (interested parties) in various ways and at various levels in different stages of the Krka National Park management cycle.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>THE FINAL PRESENTATION OF THE EVALUATION OF THE SITUATION IN THE MANAGEMENT SYSTEM OF THE KRKA NATIONAL PARK, ANALYSIS OF THE RECEPTION CAPACITY (January 3, 2019)<\/strong><\/p>\n<p>The final presentation of the \u201cEvaluation of the situation in the management system of the Krka National Park, analysis of the reception capacity\u201d was held on the 3<sup>rd<\/sup>\u00a0of January 2019. The presentation was attended by members of the project team from the PI Krka National Park, and a member of the expert team, the representative of the Executor, Marko Jakeli\u0107, who carried out a detailed presentation of the Evaluation. It was concluded that the Evaluation had been prepared in accordance with the procurement documentation and the contract, taking into account all the specific features of the Krka National Park and the needs of the PI Krka National Park established through the coordination and workshops that had been carried out.<\/p>\n<p>In the presentation of the Evaluation, emphasis was placed on the content, the methodology of production, key concepts, the relations of valid documents and documents and projects currently under development or implementation, analysis of guidelines related to visitor numbers according to management zones, the evaluation of the situation on the basis of items in accordance with the guidelines of the HAOP from 2018, and a SWOT analysis of such contributions to the study. The Evaluation cites all relevant information as of the end of December 2018.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>THE STUDY OF VISITOR MANAGEMENT \u2013 THE VISITOR MANAGEMENT ACTION PLAN<\/strong><\/p>\n<p>WORKSHOPS HELP WITH INTERESTED PARTIES (8<sup>th<\/sup>\u00a0and 9<sup>th<\/sup>\u00a0of April 2019)<\/p>\n<p>The APUP was designed in accordance with the principles of adaptive and participatory management\/planning. Participation refers to the involvement of interested parties in various manners and at various levels in different stages of the Krka National Park management cycle.<\/p>\n<p>Six workshops in total with local interested parties were held on the 8<sup>th<\/sup>\u00a0and 9<sup>th<\/sup>\u00a0of April 2019 with the aim of informing them about the ongoing activities of the Krka National Park. Proposals and opinions of the interested parties have been included in the drafting of goals and activities for the management of visitors to the Krka National Park to 2031.<\/p>\n<p>The workshops were attended by varied interested parties divided into focus groups: administrative\/public entities, institutions of science and culture (polytechnics in Knin and \u0160ibenik, the University of Zadar &#8230;), \u201ceconomic entities\u201d (services in tourism, hotels, tourist agencies&#8230;), educational institutions, and local communities (cities and municipalities).<\/p>\n<p>The interested parties were thoroughly informed beforehand about the preparation of the \u201cVisitor Management Action Plan\u201d, in terms of activities carried out by the Krka National Park, and at the workshops they were informed in detail about the general and specific goals and context of the study\/APUP, and were acquainted with the key excerpts from the evaluation of the situation in the system of visits. Participants at the workshop also took part in the consideration of the preliminary proposal of the general and specific goals of visit management at the Krka National Park for the period 2019 &#8211; 2031, and further in consideration of the proposal of activities to achieve the proposed goals, and provided their principal and specific comments, opinions, and suggestions for further work on drafting goals and activities for managing visitors to the Krka National Park during the stated planning period.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>FINAL PRESENTATION OF THE STUDY OF VISIT MANAGEMENT (July 3, 2019)<\/strong><\/p>\n<p>The Public Institution Krka National Park (further: PI Krka National Park), which manages the protected area of the Krka National Park (further: Krka National Park), has commissioned an evaluation of the situation in the management system of the Krka National Park, an analysis of the reception capacity, and a study of the visitor management (further: the SUP \u2013 APUP Project).<\/p>\n<p>&nbsp;<\/p>\n<p>The process of contracting the service was carried out as part of the grant contract for the project &#8220;The Unknown Krka \u2013 Hidden Treasures of the Upper and Middle Courses of the Krka River&#8221; (CC 06.1.2.01.0003) in the framework of the Call for Proposals for the Promotion of Sustainable Utilization of the Natural Heritage in National and Nature Parks, as a part of the Operational Program &#8220;Competitiveness and Cohesion 2014-2020&#8221;. The project is co-financed by the European Union from the European Regional Development Fund.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><u>General aims of the SUP \u2013 APUP Project:<\/u><\/p>\n<p>Based on the evaluation of the existing situation and the current visitor management system of the Krka National Park, to develop a management framework and set appropriate goals, activities, and performance indicators that will improve the visitor management and infrastructure of the Krka National Park in line with the protection of natural and other elements.<\/p>\n<p>&nbsp;<\/p>\n<p><u>Specific aims of the SUP \u2013 APUP Project:<\/u><\/p>\n<ul>\n<li>Evaluation of the situation \u2013 according to the guidelines of HAOP from March 2018 (http:\/\/www.haop.hr\/hr\/tematska-podrucja\/zasticena-podrucja\/upravljanjezasticenim-podrucjima\/smjernice), along with adaptation to all specific features of the Krka National Park \u2013 particularly encompassing the evaluation and sythesis of all research advances to the present and administrative experience of the Krka National Park, and if necessary carry out further research;<\/li>\n<\/ul>\n<ul>\n<li>Along with the area of the Krka National Park, to complete an integral overview of the broader region (zone of influence and functional region) related to the vision, visitation, and corresponding visitor infrastructure of the Krka National Park ;<\/li>\n<\/ul>\n<ul>\n<li>After revision\/establishment of management objectives, the determination of appropriate indicators, standards, and strategies and techniques for managing the number, structure and spatial-temporal distribution of visitors;<\/li>\n<\/ul>\n<ul>\n<li>Through the application of the cumulative experience of the management staff and a methodology consistent with current world practices and theoretical frameworks (particularly recent IVUMC-VUM, as a synthesis of ROS \/ LAC \/ VERP experience), the evaluation of ecosystem services and relevant recommendations (IUCN, KEC, EUROPARC, HAOP\u2026), to develop a management visitor model suitable for the Krka National Park;<\/li>\n<\/ul>\n<ul>\n<li>The definition of zones according to visiting intensity (from zones without visits to those with intensive visits) according to the aims of management and protection, and offer suggestions for micro-zone definition o (scale 1:5000, 1:2000\/1:1 000);<\/li>\n<\/ul>\n<ul>\n<li>To propose programs and activities open to participation by local interested parties and to stimulate local development;<\/li>\n<\/ul>\n<ul>\n<li>Present the conclusions of the Project in textual, graphic, graphic-textual, and tabular depictions, where all the complex elements of the process and conditions tied to visiting the Krka National Park \u2013 both within the Park as well as in the immediate and broader vicinity \u2013 are communicated in a concise and operational (implementative) oriented manner ( including guidelines for linking sectional plans\/documents);<\/li>\n<\/ul>\n<ul>\n<li>Issue instructions to the Park Management on how to monitor the number of visitors in relation to the given levels of protection, taking into account the spatial and other regulations, the experiences from implementation of the management plan in 2011-2017, and the principles of participatory and adaptive management in a dynamic environment.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p>After completion of the study \u201cEvaluation of the Situation in the Management System of the Krka National Park, Analysis of the Reception Capability\u201d (further: Evaluation), the project task in relation to the Visitor Management Study was carried out, in accordance with DON, in 2 phases:<\/p>\n<p><u>Phase 1: The general aims and framework of visitor management at the\u00a0<\/u>Krka National Park<\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li>After obtaining results from the first study, it is necessary to propose guidelines for the study of visitor management;<\/li>\n<li>Informed application of load capacity concepts and evaluation of ecosystem services by referencing relevant visitor management frameworks (especially the recent IVUMC-VUM7) and recommendations (IUCN, KEC, EUROPARC, HAOP), leading to the development of a visitor management framework suitable for the Krka National Park;<\/li>\n<li>SWOT analysis;<\/li>\n<li>The organization of workshops\/consultations with local interested parties:<\/li>\n<\/ul>\n<ol>\n<li>Local and regional administrations,<\/li>\n<li>Offices of the Tourist Bureaus of the \u0160ibenik-Knin, Split-Dalmatian, and Zadar Counties,<\/li>\n<li>Guest service providers (hotels, restaurants, private accommodation renters),<\/li>\n<li>Travel agencies,<\/li>\n<li>Educational institutions,<\/li>\n<li>The local inhabitatants.<\/li>\n<\/ol>\n<ul>\n<li>Revision of aims \/ new aims in visitor management:<\/li>\n<\/ul>\n<ol>\n<li>Targeted spatial-temporal organization of visitation, structure of visitors,<\/li>\n<li>A review of visitor management strategies and techniques, as well as appropriate quantitative and qualitative indicators and standards,<\/li>\n<li>Proposal of measures to reach target groups of visitors;<\/li>\n<\/ol>\n<ul>\n<li>Guidelines for the development of a new management plan and other educational plans, projects, research, and monitoring;<\/li>\n<li>Reviewing the possibilities of improvement to the visitor management system in the planning periods according to the needs of the Krka National Park;<\/li>\n<li>Proposing an appropriate visitor management framework for Krka National Park.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><u>Phase 2: Action Plan for Visitor Management at the Krka National Park in 2019 \u2013 2031<\/u><\/p>\n<ul>\n<li>Identification of specific management aims and activities required to achieve the set goals:<\/li>\n<\/ul>\n<ol>\n<li>Cartographic representation, numbering, and naming of individual zones,<\/li>\n<li>Proposals in terms of the form of visitation and the association with a particular area of visits,<\/li>\n<li>Evidence of the infrastructure needed with cost estimates,<\/li>\n<li>Proposal for a branding concept and marketing activities with cost estimates;<\/li>\n<\/ol>\n<ul>\n<li>Determining indicators to monitor implementation and evaluate the effectiveness of visitor management at the Krka National Park;<\/li>\n<li>Estimation of the resources required, showing the possible costs;<\/li>\n<li>Definition of management performance indicators required in the following period for implementation of the action plan;<\/li>\n<li>Presenting conclusions to interested local parties;<\/li>\n<li>Establishing guidelines for conducting future research (what research to conduct, in what period, the goals, which interested parties to gather and why);<\/li>\n<li>Establishing a system for evaluation and monitoring the implementation of the action plan with clearly defined activities, chronological framework, responsibilities, and resources needed for implementation;<\/li>\n<li>Establishment of a system for monitoring the implementation of the action plan indicators with the specified sources and dynamics of verification.<\/li>\n<\/ul>\n<p>The presentation of the final document of the \u201cStudy of Visitor Management at the Krka National Park\u201d was held on the 3<sup>rd<\/sup>\u00a0of July 2019. The presentation was attended by members of the project team of the Public Institution Krka National Park, the representative of the Executor, Marko Jakeli\u0107, and all the executives involved in the composition of the Study.<br \/>\n[\/en]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u201cEvaluation of the Situation in the Management System of the Krka National Park, Analysis of the Reception Capability\u201d and \u201cThe Study of Visitor Management at the Krka National Park\u201d<\/p>","protected":false},"author":1,"featured_media":2594,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[34],"tags":[],"class_list":["post-2593","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nepoznata-krka"],"_links":{"self":[{"href":"https:\/\/npkrka.hr\/en_us\/wp-json\/wp\/v2\/posts\/2593","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/npkrka.hr\/en_us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/npkrka.hr\/en_us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/npkrka.hr\/en_us\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/npkrka.hr\/en_us\/wp-json\/wp\/v2\/comments?post=2593"}],"version-history":[{"count":4,"href":"https:\/\/npkrka.hr\/en_us\/wp-json\/wp\/v2\/posts\/2593\/revisions"}],"predecessor-version":[{"id":13926,"href":"https:\/\/npkrka.hr\/en_us\/wp-json\/wp\/v2\/posts\/2593\/revisions\/13926"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/npkrka.hr\/en_us\/wp-json\/wp\/v2\/media\/2594"}],"wp:attachment":[{"href":"https:\/\/npkrka.hr\/en_us\/wp-json\/wp\/v2\/media?parent=2593"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/npkrka.hr\/en_us\/wp-json\/wp\/v2\/categories?post=2593"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/npkrka.hr\/en_us\/wp-json\/wp\/v2\/tags?post=2593"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}